L&T commissions green hydrogen plant in Gujarat

L&T commissions green hydrogen plant in Gujarat
Larsen & Toubro (L&T), an Indian multinational engaged in EPC projects, has commissioned a green hydrogen plant at its AM Naik Heavy Engineering Complex in Hazira, Gujarat. EOG Facebook L&T commissions green hydrogen plant in Gujarat Digital platform - EOG

L&T commissions green hydrogen plant in Gujarat 

Larsen & Toubro (L&T), an Indian multinational engaged in EPC projects, has commissioned a green hydrogen plant at its AM Naik Heavy Engineering Complex in Hazira, Gujarat. The production of green hydrogen based on an alkaline electrolysis process has started and the plant will produce 45 kg/day of green hydrogen daily, which will be used for captive consumption in the company’s Hazira manufacturing complex. 

The plant is designed for an electrolyser capacity of 800 kW comprising both Alkaline (380 kW) and PEM (420 kW) technologies and will be powered by a rooftop solar plant of 990kW peak DC capacity and a 500kWh battery energy storage system (BESS). As part of the first phase of the project, a 380 kW alkaline electrolyser has been installed, while the 420 kW PEM electrolyser along with solar plant capacity augmentation to 1.6 MW peak DC, will be part of future expansion.

L&T commissions green hydrogen plant in Gujarat

Commenting on the occasion, Subramanian Sarma, Director & Senior Executive Vice President (Energy), L&T said: “L&T is atthe forefront of providing innovative and sustainable solutions that will help meet the energy needs of the future. We are proud that our engineers have set up the Green Hydrogen generation plant at Hazira complex and integrated it with the existing manufacturing shops for use of the green hydrogen.” 

He added that “This initiative is in line with L&T’s climate leadership targets of Lakshya-2026 that will help reduce greenhouse gases footprint for us as well as our clients by approximately 300 tonnes/annum. We believe that green hydrogen is a promising alternative fuel, and this plant is a testimony that we are committed to creating a greener tomorrow.” 

The plant is spread across 3,000 sq m, and the first phase of the project has been installed, tested, and commissioned. The scope involves the generation of high purity green hydrogen (99.99%) and oxygen, and their captive consumption in the manufacturing shops. A blend of 15% hydrogen with natural gas will be used as a fuel, and oxygen will supplement the existing usage in cutting and welding applications. 

To ensure safe operation and production, the plant design incorporates both active and passive safety systems and will be operated through control systems with remote monitoring functionality. In addition, an integrated data analytics platform designed by L&T will provide insights into the performance of the electrolysers and the overall plant. 

5 Trackbacks & Pingbacks

  1. locksmith Selinsgrove PA
  2. Tesing Automation platform
  3. psilocybe mushroom shop​
  4. white widow x crystal meth auto
  5. take a look at the site here

Comments are closed.